Call Now

+86-13826247298

Lemon tree

Flat Pack container house

Flat Pack container house

Good design assembled Flat pack container house

Advantage: The base & the roof of Flat Pack Container already are finished the installation at factory. Just use the crane to discharge the product and assemble the rest of materials by screws at site, flat pack container house installation will be completed. It is the very fast way to erect a prefab home.
Flat Pack container house

Application: The construction site of the high-end demand for overlay products, such as the project manager’s office, residential buildings, conference room etc.

One 40HQ shipment container can be loaded 6 sets.

 

Example

 

Here is a basic material list for Flat Pack container house for reference.

1.Roof beam: Length 5380mm, 3.0mm thk & length 2040mm, 2.75mm thk;
2.Roof purlin: Thickness are 1.8mm & 2.5mm
3.Corner: /
4.Pillar: Length 2536mm, thk 2.75mm
5.Pillar trim: Length 2536mm
6.Bottom beam: Length 5380mm, 3.0mm thk & length 2040mm, 3.0mm thk;
7.Bottom purlin: Thickness 1.8mm
8.Roof tile: 60mm thk glass wool +  steel tile plate 0.476mm thk;
9.Ceiling: 0.426mm thk + lining ceiling plate 0.3mm thk;
10.Wall: 75mm thk sandwich panel, steel plate 0.426mm thk
11.Floor: Cement fiber board 18mm thk + PVC surface 2.0mm thk 
12.PVC window & Steel door
13.PVC water tube: diameter 50mm


 

Assemble step

 


 

Materials for choosing

 

Wall core panel

 

Floor board

 

Door

 

Window

 

Packing & Deliver

 

Due to the characteristic of Flat pack container house, we finished the basement and roof at factory. Then we pack the basement, roof and other materials into a box like the picture, finally we deliver the boxes to customers.

 

Project Display

 

Product detail

 

Interior Layout

 

Construction site

 

Design

 

Containers for dormitories

140x140
140x140

Containers for dormitories

Containers for shop

140x140
140x140

Containers for office

 

 1) - Place a set of flat pack container on the ground by crane and dismantle the components at first. 

 2) -Set the bottom base on the ground, install the columns. 

 3) - Assemble the roof structure, confirm the columns are vertical, and then fix the water pipes into the columns.

 4) - Erect all of sandwich wall panels and install the window, the door at the same time. At last, processing the all of the edges by aluminum skirting and sealed the gaps by glass glue.

Download

 Here are the catalogs from Lemon Tree, welcome to download them after leave your basic info.

 Hope our professional will helpful for yours.

 

Tips on getting accurate quotes from suppliers.
Please include the following in your inquiry:
1. Personal or business information
2. Provide product request in great detail
3. Inquiry for MOQ, Unit Price, etc


Please make sure your contact information is correct. Your message will be sent directly to the recipient(s) and will not be publicly displayed. We will never distribute or sell your personal information to third parties without your express permission.